The industrial production of Green Code precast concrete elements follows the schedule completely regardless of weather, if necessary in shift operations. Standardization and automation enable the highest quality with optimized material use. Precisely fitting system elements with integrated insulation and building services are delivered just-in-time to the construction site. The surfaces are paint-ready and do not require additional plastering or cladding. All of this enormously accelerates the construction process, reduces personnel requirements on site, and lowers construction costs. The finished Green Code buildings impress with a short, highly efficient construction phase and minimal energy consumption throughout their entire service life:
- 35% lower energy consumption for heating and cooling.
- 20% fewer total operating costs (investment, maintenance, energy) after 10 years of operation.