Less Personnel on the Construction Site

Construction workers installing Green Code double wall precast elements on alpine construction site – energy-efficient precast construction

New Ways of Working: When building with Green Code, the work process significantly shifts to areas where modern technologies are deployed.

Up to 60% Fewer Workers on Site

Instead of performing extensive formwork and reinforcement work on site, the majority of work is carried out in the planning office and production facility. There, precast concrete elements are manufactured in a controlled, dry environment – computer-controlled and robot-assisted. These prefabricated building components are then delivered just-in-time to the construction site, which thus transforms primarily into an assembly location.

This process reduces the need for specialized skilled workers on site by up to 60% compared to conventional construction methods. And it provides safer and drier working conditions during construction. Particularly during times of skilled labor shortages, this offers a significant advantage, as jobs in production are designed to be modern and future-proof. This demonstrates that Green Code not only increases efficiency and quality in construction, but also simplifies construction site logistics and optimizes personnel deployment.

Close-up of construction worker placing insulation panels into precast concrete element formwork

Discover us on social media

Contact us

info@green-code.com

Subscribe our newsletter

Subscribe now